Mass Decontamination Units
![Oklahoma Prairie Gold Chevron pointing right to a title](/homeland-security/regional-response-system/mass-decontamination-units/_jcr_content/responsivegrid/image_copy_copy_395107396.coreimg.100.2048.png/1646261973268/ok-chevron-prairiegold-rgb-292x300.png)
Overview
There is ONE Mass Decontamination unit located in the state. The unit is a self-driven apparatus that contains the decontamination system inside. It contains a generator, the ability to produce hot water, and external decontamination shower heads. The unit cost $280,000 to build and equip.
![Tulsa Fire Department Mass Decontamination Unit](/homeland-security/regional-response-system/mass-decontamination-units/_jcr_content/responsivegrid/image.coreimg.100.2048.jpeg/1646263344591/tulsa-mass-decon-trailer.jpeg)
![Oklahoma Prairie Gold Chevron pointing right to a title](/homeland-security/regional-response-system/mass-decontamination-units/_jcr_content/responsivegrid/image_copy_copy_445166032.coreimg.100.2048.png/1646261973268/ok-chevron-prairiegold-rgb-292x300.png)
Capabilities
- Decontaminating victims and responders at a rate of 150-200 persons per hour
- Rest and recovery center
- Medical treatment and triage
- Personnel staging area
![Oklahoma Prairie Gold Chevron pointing right to a title](/homeland-security/regional-response-system/mass-decontamination-units/_jcr_content/responsivegrid/image_copy_copy_1935618226.coreimg.100.2048.png/1646261973268/ok-chevron-prairiegold-rgb-292x300.png)
Team Information
- A Minimum of 10 Team Members
- A Minimum of 10 Team Members IFSAC-Certified to the NFPA 472 Hazardous Materials Operations Level
Last Modified on
Mar 02, 2022