Jul 11, 2024 10:30 a.m.
If the below page data does not load, we recommend clearing your browser cache by pressing Ctrl + F5 or use Mozilla Firefox browser.
Call Order: | 500 | Calendar Days: | 365 Days |
Contract ID: | 240155 | DBE Goal: | 15 |
J/P No.: | 24066(04) | Project No.: | STP-103C(091)PM |
Counties: | ATOKA | ||
Contract Description: | GRADE, DRAIN, SURFACE, AND BRIDGE SH-7: FROM 6.0 MILES EAST OF THE JOHNSTON COUNTY LINE, EXTEND EAST NEAR ATOKA. PROJECT LENGTH = 5.426 MILES | ||
Addenda | Long Form | Bid Tab | |
Pre-Bid Letters | Pre-Bid Q & A | Sample Proposal | |
Call Order: | 505 | Calendar Days: | 200 Days |
Contract ID: | 240156 | DBE Goal: | 14 |
J/P No.: | 27105(04) / 27106(04) | Project No.: | STP-209C(119)PM / STP-209C(120)PM |
Counties: | CANADIAN | ||
Contract Description: | BRIDGE AND APPROACHES US-270: OVER UNNAMED CREEKS, 6.1 MILES AND 10.3 MILES EAST OF THE BLAINE COUNTY LINE NEAR GEARY AND CALUMET. PROJECT LENGTH = 0.539 MILES | ||
Addenda | Long Form | Bid Tab | |
Pre-Bid Letters | Pre-Bid Q & A | Sample Proposal | |
Call Order: | 510 | Calendar Days: | 180 Days |
Contract ID: | 240157 | DBE Goal: | -- |
J/P No.: | 34118(04) | Project No.: | TAP-215N(054)TP |
Counties: | COAL | ||
Contract Description: | PEDESTRIAN IMPROVEMENTS (SIDEWALKS) CITY STREET (SOUTH BROADWAY): FROM CHERRY AVENUE, EXTEND SOUTH IN COALGATE. PROJECT LENGTH = 1.214 MILES | ||
Addenda | Long Form | Bid Tab | |
Pre-Bid Letters | Pre-Bid Q & A | Sample Proposal | |
Call Order: | 515 | Calendar Days: | 240 Days |
Contract ID: | 240158 | DBE Goal: | 14.5 |
J/P No.: | 31863(04) | Project No.: | STP-247B(051)PM |
Counties: | MAJOR / WOODS | ||
Contract Description: | WIDEN AND RESURFACE US-281: FROM THE US-412 JUNCTION, EXTEND NORTH NEAR CHESTER. PROJECT LENGTH = 6.305 MILES | ||
Addenda | Long Form | Bid Tab | |
Pre-Bid Letters | Pre-Bid Q & A | Sample Proposal | |
Call Order: | 521 | Calendar Days: | 180 Days |
Contract ID: | 230333 | DBE Goal: | -- |
J/P No.: | 35336(06) | Project No.: | STP-299S(331)IT |
Counties: | TULSA / WAGONER | ||
Contract Description: | ITS (DYNAMIC MESSAGE SIGNS) I-244/SH-51/BA EXPRESSWAY/MUSKOGEE TURNPIKE: AT MULTIPLE LOCATIONS IN TULSA AND BROKEN ARROW. PROJECT LENGTH = 0.00 MILES | ||
Addenda | Long Form | Bid Tab | |
Pre-Bid Letters | Pre-Bid Q & A | Sample Proposal | |
- END DATA - |
Last Modified on
Mar 28, 2025