Skip to main content

NOTICE: Our licensing windows will be closed on Monday, Dec 16th from 10:00 am to 1:00 pm for agency-wide training. We apologize for any inconvenience.

 

Licensing Window Information: Please be advised that our licensing windows are now located on the first floor. The hours of operation are as follows: Thursdays: 8:00 a.m. to 12:00 p.m.  Mondays, Tuesdays, Wednesdays, and Fridays: 8:00 a.m. to 4:00 p.m. We accept payments via check, money order, and most major credit cards. We do not accept cash under any circumstances.

Asbestos Project Designer License

The Asbestos Project Designer License is required for individuals who prepare plans and specifications for asbestos abatement projects. This license ensures that project designers are properly trained to create comprehensive and effective plans that address the safe removal, encapsulation, or enclosure of asbestos-containing materials (ACM), ensuring safety and regulatory compliance.

Purpose: The license ensures that only trained and certified professionals design asbestos abatement projects, which is crucial for maintaining high standards of safety and compliance. Effective project design helps protect workers, building occupants, and the environment from the dangers of asbestos exposure.

Function and Use:

  • Licensed project designers develop detailed plans and specifications for asbestos abatement projects, outlining the methods and procedures to be used.

  • License holders ensure that all project designs comply with relevant federal, state, and local regulations, providing guidelines for safe and effective asbestos abatement.

  • Designers incorporate safety protocols and protective measures into their plans to minimize asbestos exposure risks for workers and building occupants.

  • Project designers work closely with asbestos abatement contractors to ensure that their designs are accurately implemented and that all work is conducted according to the specified plans.

  • Designers maintain detailed records of their project designs and any modifications, ensuring that all aspects of the project are documented for regulatory review and compliance.

Last Modified on Jun 18, 2024
Back to Top