Project Description Total Project Cost Federal Share State Share Local Share Fiscal Year
Grant agreement 9-31-100-C301, acquire land, construct RW 3,000' x 75', stub TW, apron, fencing, MIRL, beacon, LWC and segmented circle $0.00 $0.00 $0.00 $0.00 1963
Construct new airport $5,000.00 $0.00 $5,000.00 $0.00 1965
Extend and pave RW (1,000 x 75 to 4,000); construct turnaround; marking and fencing; extend RW lighting; install VASIs; install drainage structure (F,S,L participation: total project cost $150,000) $75,000.00 $75,000.00 $0.00 $0.00 1972
Overlay 3,000' of north/south RW $17,300.00 $0.00 $17,300.00 $0.00 1974
Construct TW and apron; relocate fuel facilities; install fencing; marking (F,S,L participation: total project cost $121,935) $121,935.00 $92,731.00 $14,602.00 $14,602.00 1976
Phase II: construct apron $131,360.00 $131,360.00 $0.00 $0.00 1979
Repair MIRL, VASI, REIL and wind cone; construct new lighting control house and rebuild regulator $35,000.00 $0.00 $35,000.00 $0.00 1982
Conduct Airport Master Plan study $33,210.00 $33,210.00 $0.00 $0.00 1983
Rout and seal RW cracks; repair parking apron and access TW; install drainage; reconstruct and extend access TW to public T-hangars $58,825.00 $0.00 $58,825.00 $0.00 1988
Extend and mark RW 17/35 (4,000 to 5,000) $711,624.00 $630,000.00 $50,000.00 $31,624.00 1990
Reconstruct apron $509,000.00 $458,100.00 $12,725.00 $38,175.00 1995
Clean and seal cracks RW 17/35 $20,000.00 $0.00 $16,000.00 $4,000.00 1996
Clean and seal cracks RW 17/35 $66,200.00 $0.00 $13,240.00 $52,960.00 1996
Install security fencing $367,000.00 $330,300.00 $18,350.00 $18,350.00 1999
Install perimeter fence (8 ft x 18,250 lf) $348,650.00 $313,786.00 $17,432.00 $17,432.00 2000
Rehabilitate Taxiway (Clean/Seal Cracks) $74,074.00 $66,667.00 $0.00 $7,407.00 2001
Clean & seal cracks, seal coat and mark RW, TW & apron. Reconstruct portion of aircraft parking apron $120,000.00 $0.00 $108,000.00 $12,000.00 2002
Construct T-hangar accessTW (100' x 35'), 12,500# $14,000.00 $0.00 $11,200.00 $2,800.00 2002
Rehabilitate Taxiway $40,000.00 $36,000.00 $0.00 $4,000.00 2002
Construct Apron $34,074.00 $30,667.00 $0.00 $3,407.00 2002
Construct Taxiway $780,000.00 $741,000.00 $0.00 $39,000.00 2005
Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway $272,000.00 $258,400.00 $0.00 $13,600.00 2010
Extend Taxiway $332,000.00 $315,400.00 $0.00 $16,600.00 2011
Rehabilitate Runway [Runway Rehabilitation (Design Only, Phase I)] - 18/36, Rehabilitate Taxiway [Design only, Phase I] $90,300.00 $81,270.00 $0.00 $9,030.00 2014
Rehab runway 18/36 and a portion of parallel taxiway $2,277,953.00 $2,050,157.00 $113,897.00 $113,898.00 2015
Install Runway Vertical/Visual Guidance System - 18/36, Reconstruct Runway Lighting - 18/36 $86,000.00 $77,400.00 $0.00 $8,600.00 2017
Construct concrete hardstand within main parking apron $122,026.00 $0.00 $115,924.00 $6,102.00 2017
Rehabilitate Runway Lighting $679,968.89 $611,972.00 $0.00 $67,996.89 2018
Install new LED REILs, LED PAPIs, AWOS, and rotating beacon $385,177.00 $0.00 $365,918.00 $19,259.00 2019
Rehabilitate Taxiway & Apron Pavements and Replace Taxiway Lighting System $500,604.58 $0.00 $475,573.69 $25,030.89 2020
Extend Taxiway *Local Share covered by 2020 CARES Act Funding* $1,403,758.89 $1,263,383.00 $0.00 $140,375.89 2020
CRRSA Act Funds $13,000.00 $13,000.00 $0.00 $0.00 2021