Project Description Total Project Cost Federal Share State Share Local Share Fiscal Year
Develop Airport Layout Plan - $0.00 $0.00 $0.00 $0.00
Construct runway (3,500 x 60), turnaround, segmented circle; install runway lights, wind cone, VASIs $0.00 $0.00 $0.00 $0.00 1972
Construct runway, turnaround, stub taxiway, and apron (F,S,L participation) $0.00 $0.00 $0.00 $0.00 1975
Rehabilitate Runway, Taxiway, And Apron $49,670.00 $44,703.00 $4,967.00 $0.00 2002
the development of airport layout plans and associated surveys $24,000.00 $22,800.00 $1,200.00 $0.00 2004
Improve Runway Safety Area [Improve Safety Area (Design Only)] - 15/33, Install Airport Beacons [Install Airport Beacon (Design Only)] - -, Install Miscellaneous NAVAIDS [Install Miscellaneous NAVAIDS (Design Only)], Rehabilitate Apron [Rehabilitate Apron (Design Only)] - -, Rehabilitate Runway [Rehabilitate runway (DESIGN ONLY)] - 15/33 $60,200.00 $57,190.00 $3,010.00 $0.00 2006
rehabilitation of 15/33 and the turnaround, relocate the 33 threshold, add pavement markings for the new runway length, improve runway approach and runway safety grading and remove trees from within the runway approaches $775,793.00 $737,003.00 $38,790.00 $0.00 2007
Design for relocation of existing waterline on airport property $12,210.61 $0.00 $6,105.31 $6,105.31 2019
Construction for relocation of existing waterline on airport property $50,571.87 $0.00 $25,285.94 $25,285.94 2019
CA Inspection relocation of existing waterline on airport property $17,941.61 $0.00 $8,970.81 $8,970.81 2019
Install Runway Lighting [Multi-Year Funding] - 15/33, Rehabilitate Runway [Multi-Year Funding] - 15/33 $520,169.92 $299,999.00 $220,170.92 $220,170.92 2019
Install Taxilanes and Partial Perimeter Fence $733,033.30 $0.00 $773,033.30 $0.00 2020