Project Description Total Project Cost Federal Share State Share Local Share Fiscal Year
Rehabilitate Apron - South Terminal apron. $0.00 $0.00 $0.00 $0.00
Improve Access Road - Pave airport entrance road $0.00 $0.00 $0.00 $0.00
Construct Taxiway - Construct parallel TW from City Hangar to spray plane staging area $0.00 $0.00 $0.00 $0.00
Install Runway Vertical/Visual Guidance System - Install for RW 17/35 $0.00 $0.00 $0.00 $0.00
Install Weather Reporting Equipment - Replace AWOS $0.00 $0.00 $0.00 $0.00
Construct Apron - Reconstruct South GA Apron $0.00 $0.00 $0.00 $0.00
Prepare Airport Action Plan $0.00 $0.00 $0.00 $0.00
Repair pavement adjacent to Hangar 105 $0.00 $0.00 $0.00 $0.00
Reconstruct apron west of Terminal Bldg. - $0.00 $0.00 $0.00 $0.00
Design engineering, reconstruct main apron - $0.00 $0.00 $0.00 $0.00
Phase II, reconstruct main apron - $0.00 $0.00 $0.00 $0.00
Reconstruct edge of aircraft parking apron - $0.00 $0.00 $0.00 $0.00
Install Security fence and gates - $0.00 $0.00 $0.00 $0.00
Reconstruct T-Hangar Taxi lanes - $0.00 $0.00 $0.00 $0.00
Reconstruct general aviation apron - $0.00 $0.00 $0.00 $0.00
Install Runway Vertical/Visual Guidance System - Install REILS for RW 17/35 $0.00 $0.00 $0.00 $0.00
Slurry seal RWs and TWs $21,378.00 $0.00 $21,378.00 $0.00 1970
Slurry seal additional RW areas, TWs, and aircraft parking ramp $32,115.00 $0.00 $32,115.00 $0.00 1971
RW and shoulder markings for RW 17/35 and RW 3/21; seal apron joints $21,020.00 $0.00 $21,020.00 $0.00 1975
Install RW lighting, VASI-2s, TW lighting (F,S,L participation: total project cost $125,888) $9,588.00 $9,588.00 $0.00 $0.00 1976
Construct partial parallel TW $53,400.00 $0.00 $53,400.00 $0.00 1978
Install ARTAIS automatic voice terminal weather reporting system (AWOS I) $34,800.00 $0.00 $34,800.00 $0.00 1981
Overlay and mark RWs; improve drainage $367,470.00 $367,470.00 $0.00 $0.00 1982
Improve RW and TW $630,000.00 $630,000.00 $0.00 $0.00 1983
Install new rotating beacon $21,110.00 $0.00 $21,110.00 $0.00 1983
Reconstruct/construct TWs $490,000.00 $490,000.00 $0.00 $0.00 1984
Construct, reconstruct, and light TWs; improve drainage $605,000.00 $605,000.00 $0.00 $0.00 1985
Conduct EA and Airport Master Plan study $50,850.00 $50,850.00 $0.00 $0.00 1985
Rout, clean, sterilize, and seal cracks; apply seal coat and remark parallel TW and T-hangar TW apron $33,800.00 $0.00 $33,800.00 $0.00 1985
Acquire land for approaches $500,000.00 $500,000.00 $0.00 $0.00 1986
Acquire land for approaches $761,554.00 $761,554.00 $0.00 $0.00 1987
Phase I: rehabilitate apron $741,072.00 $741,072.00 $0.00 $0.00 1987
Rehabilitate portions of apron area one; includes rout, clean, and seal joints $823,414.00 $823,414.00 $0.00 $0.00 1988
Extend RW; construct TW; install RW and TW lighting and signage $2,178,500.00 $1,960,650.00 $50,000.00 $167,850.00 1989
Phase II: extend RW 17/35; pave RW and parallel and connecting TWs $1,263,560.00 $1,125,414.00 $50,000.00 $88,146.00 1990
Reconstruct and extend apron, area 2N $916,670.00 $825,000.00 $45,835.00 $45,835.00 1991
Rehabilitate aprons (areas 1 and 2) $1,434,450.00 $1,291,000.00 $50,000.00 $93,450.00 1991
Reconstruct and mark RW 3/21; rehabilitate MIRL RW 3/21; remove south end RW 17/35 and construct, ma $1,015,560.00 $914,000.00 $50,780.00 $50,780.00 1992
Reconstruct hangar access apron $49,500.00 $0.00 $39,600.00 $9,900.00 1995
Update Airport Master Plan $54,007.00 $48,607.00 $2,700.00 $2,700.00 1995
Rehabilitate TWs A, B, and G and install fence $173,200.00 $155,880.00 $8,660.00 $8,660.00 1995
Rout, clean, seal coat, and mark RW 17/35 and TW H $121,149.00 $0.00 $96,920.00 $24,229.00 1998
Upgrade AWOS TO AWOS III T/P $36,000.00 $0.00 $36,000.00 $0.00 2000
Rehabilitate taxiway $645,000.00 $580,500.00 $0.00 $64,500.00 2000
Rehabilitate apron $454,147.00 $431,440.00 $0.00 $22,707.00 2003
Install airfield guidance signs; rehab apron $2,205,263.00 $2,095,000.00 $0.00 $110,263.00 2004
Security Fence and Gate $204,750.00 $0.00 $204,750.00 $0.00 2004
is phase II of an aircraft parking apron and taxilane reconstruction project. $2,412,034.00 $2,290,007.00 $51,350.00 $70,677.00 2005
Replace existing AWOS III T/P $79,977.00 $0.00 $79,977.00 $0.00 2006
Installation of airport lighting control equipment $190,200.00 $0.00 $171,180.00 $19,020.00 2006
Rehabilitate Runway Lighting - 03/21 $209,932.00 $199,435.00 $0.00 $10,497.00 2007
Pavement Maintenance Project $146,230.00 $0.00 $131,607.00 $14,623.00 2007
Runway 17/35 Rehab- Design Only $129,420.00 $0.00 $116,478.00 $12,942.00 2007
asphalt overlay of runway 17/35; crack seal and seal north asphalt main apron and crack seal and seal taxiway A $2,554,974.00 $2,006,687.00 $451,212.00 $97,075.00 2008
Unknown $171,163.00 $0.00 $171,163.00 $0.00 2008
Update Airport Master Plan Study $97,015.00 $92,164.00 $0.00 $4,851.00 2009
Rehabilitate Apron [Design only reconstruct south terminal apron], Rehabilitate Taxiway $192,500.00 $182,875.00 $0.00 $9,625.00 2010
installing vertical/visual approach guidance indicators (PAPI’s) on runway 17/35 and runway 03/21, improving the existing segmented circle, and installing a supplemental wind cone at runway 17 end $371,022.00 $0.00 $333,920.00 $37,102.00 2010
Reconstruct the south main apron and airport fencing. $2,159,671.00 $2,040,606.00 $64,198.00 $54,867.00 2011
Improve Runway Safety Area [Design] - 03/21, Rehabilitate Runway 03/21 [Phase I - Design] $302,040.00 $271,836.00 $0.00 $30,204.00 2013
Rehabilitate runway 03/21 and improve safety areas on both runway ends. $2,449,978.00 $2,204,980.00 $111,391.00 $133,607.00 2014
Crack seal, seal coat, remark primary runway 17/35 $312,600.00 $0.00 $239,715.00 $72,885.00 2015
PER - Reconstruct Taxiway $96,000.00 $86,400.00 $9,600.00 $0.00 2017
Install Weather Reporting Equipment $239,385.56 $215,447.00 $0.00 $23,938.56 2017
Rehabilitate Runway - Crack Repair $164,163.33 $147,747.00 $0.00 $16,416.33 2018
Rehabilitate Taxiway (Design) $159,367.78 $143,431.00 $0.00 $15,936.78 2018
Rehabilitation of parallel taxiway systems for RY 18/36 $5,683,912.00 $5,124,230.00 $279,840.00 $279,842.00 2019
CRRSA Act Contract Tower $34,162.00 $34,162.00 $0.00 $0.00 2021
CRRSA Act Funds $23,000.00 $23,000.00 $0.00 $0.00 2021
Update Airport Master Plan or Study *Local Share covered by 2021 ARPA Funding* $333,333.00 $333,333.00 $0.00 $0.00 2021