Bridging the Gap: Multimodal Connections on I-35 over the OK River
Narrative
Budget
Financial Assurance
Preliminary Engineering
- Aesthetic Study Report
- Collision Analysis Report
- Cost Schedule Tables (Excel)
- Design Concept 3\4 PNP MoT Exhibits
- Final Plan Sheet Set
- Level of Service Maps
- Long Span Bridge Type Study
- Preliminary DC 15th St Ramps Retaining Wall Locations
- Preliminary Lane Capacity Analysis Report
- Preliminary RW Utility Conflict
- Reconnaissance Report - Final
- Stakeholder Presentation (Powerpoint)