Skip to main content
Please click the link below for the virtual open house summary
JP 29838(07) US-60 Improvements in Pond Creek
Where When
This will be a web-based format (no in-person meeting) 

The information will be available beginning April 11, 2023 and comments are requested by April 25, 2023.

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.

Purpose

The Oklahoma Department of Transportation (ODOT) in cooperation with the Federal Highway Administration (FHWA), proposes to make safety improvements to US-60/Broadway Avenue beginning at the junction of US-81 and extending east to Erie Street in Pond Creek, Oklahoma. This segment of US-60 is a partial curb-and-gutter facility with two to four driving lanes of varying widths. Along the corridor, the shoulders are used for parallel and angled street parking. The roadway has deteriorating pavement, a rough railroad crossing, drainage issues, and poorly defined striping that affects traffic flow. Also, there are non-compliant Americans with Disabilities Act (ADA) sidewalks located on both sides of the road. Current (2027) traffic volumes are 1,410 vehicles per day (vpd), which are projected to increase to 1,700 vpd by 2047.

The purpose of the meeting is to present information about the project and obtain input from the public to further assist in the identification of critical social, economic and environmental effects that may result from the project.

Click on the image below for a project location map.

Description

ODOT is developing design plans for improving this segment of US-60/Broadway Avenue while taking into consideration the cost of construction and potential environmental concerns. Overall, the proposed improvements consist of milling and overlaying the existing pavement, followed by restriping to clearly define the driving lanes and parking areas. Concrete medians and curb-and-gutter sections will be constructed to delineate traffic lanes, driveways, and pedestrian areas. The US- 81/US-60 intersection will be modified to improve drainage, turning movements, and traffic flow. The crossing at the railroad tracks will be improved, and sidewalks will be upgraded to meet ADA requirements. All improvements will occur within existing ODOT right-of-way, and the road will remain open with access to residences and businesses maintained throughout the project duration.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON APRIL 25, 2023

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Jul 12, 2023
Back to Top