Please click the link below for the public meeting summary
JP 32688(04)(10)(11) US-412 Improvements
  When
  Monday, February 19 - Monday, March 4, 2024

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.

Purpose

The Oklahoma Department of Transportation (ODOT) is proposing improvements to US-412 from Garland Road east to 30th Street and on US-81 from Maine Street north to West Oak Avenue through Enid in Garfield County, specifically to rehabilitate the concrete pavement, improve drainage, improve traffic operations at intersections, add Americans with Disabilities Act (ADA) compliant sidewalks, and improve grade corrections at railroad track crossings. The existing US-412 roadway from Garland Road to Hoover Street has four 12 ft.-wide driving lanes with a combination of curb and gutter and asphalt shoulders. From Hoover Street to 30th Street, the existing US-412 has a 60 ft.-wide curb and gutter section with a two-way left turn lane in the center. The existing US-81 roadway has six 12 ft.-wide driving lanes with a wide, grassed median. The existing pavement is in poor condition and US-412 has insufficient drainage at the US-412/US-81 intersection & on US-412 from Lakeview Drive to 30th Street. The purpose of the project is to improve the pavement condition within these extents.

Description

•US-412 east of US-81, JP #32688(04):

Improvements of US-412 east of US-81 will include: replacing damaged concrete panels, relocating existing concrete joints from the vehicle wheel path, replacing curbs and curb inlets, regrading railroad crossings, updating concrete panels and joints to extend the life of the pavement, improving road smoothness and rideability, improving intersection operations, improving drainage from Lakeview Drive to 30th Street, and increasing sidewalk connectivity.

•US-412 west of US-81, JP #32688(10):

Improvements of US-412 west of US-81 will include: replacing damaged concrete panels, relocating existing concrete joints from the vehicle wheel path, replacing curbs and curb inlets, regrading railroad crossings, updating concrete panels and joints to extend the life of the pavement, improving road smoothness and rideability, improving intersection operations, and increasing sidewalk connectivity.

•US-81 from Maine Street north to West Oak Avenue & US-412 Intersection,JP #32688(11):

Improvements of US-81 will include: replacing damaged concrete panels, relocating existing concrete joints from the vehicle wheel path, replacing curbs and curb inlets, updating concrete panels and joints to extend the life of the pavement, improving road smoothness and rideability, improving intersection operations, improving drainage at the US-412 and US-81 intersection, and increasing sidewalk connectivity.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON MARCH 4, 2024

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204