Field Sampling, Testing, & Acceptance Guides

Most Current Relevant Documents

Guide Title Dated Subject of Guide
1999 FAST
SiteManager Sampling Frequency Report 12/11/2020 Distinct global acceptance and testing requirements as programmed into SiteManager by contract specitfication year 1999
2009 FAST SiteManager Sampling Frequency Report 12/11/2020 Distinct global acceptance and testing requirements as programmed into SiteManager by contract specitfication year 2009
2019 FAST SiteManager Sampling Frequency Report 9/2/2021 Distinct global acceptance and testing requirements as programmed into SiteManager by contract specitfication year 2019
5000 Guide 5000 Series Field Acceptance Methods See Index Field Acceptance Methods for materials/products that are pre-delivery (shop) inspected, come from a pre-approved stock or source, or are acceptable by certification, approved listing, field observations etc.
Other Other Field Acceptance References   Documents referenced when a Field Acceptance Method is not required or is not yet defined, Field Acceptance also requires physical sampling and testing, or Approved Product Listing was manually expired/terminated.
GFAW Field Acceptance of Field Welding Guide 1/14/2004 Field Acceptance of Field Welding Guide

 

Historic Documents

Guide Title Dated Subject of Guide
MCD090724 Special Instructions
For CTB
7/24/2009 Letter from the Materials Division covering immediately applicable design, sampling, testing & acceptance instructions for Cement Treated Base (CTB)
MCD060501 Changes to the
Sampling Guide
5/1/2006 Letter from the Materials Division covering immediately applicable design, sampling, testing & acceptance changes for Bituminous Materials
MCD060425 Changes to the
Sampling Guide
4/25/2006 Letter from the Materials Division covering immediately applicable design, sampling, testing & acceptance changes for Concrete (Cylinders)
MCD040430 Changes to the
Sampling Guide
4/30/2004 Letter from the Materials Division covering immediately applicable design, sampling, testing & acceptance changes for Hydraulic Cement, Fly Ash and Concrete Aggregates
Last Modified on Sep 02, 2021