Skip to main content

Tulsa Traffic Advisory 6-1-2026

Monday, June 01, 2026

The projects below are weather permitting:

 

US-75 bridge replacement project at 81st St. 

Drivers should expect narrowed lanes and a reduced speed limit on US-75 at 81st St. through 2027 for a bridge replacement project. Two lanes of traffic will be maintained in each direction on US-75 during peak travel times.

  • 81st St. is narrowed to one lane in each direction at US-75

 

Last Modified on Jun 01, 2026
Back to Top