Skip to main content

Tulsa Traffic Advisory 12-4-25

Thursday, December 04, 2025

The projects below are weather permitting:

 

Memorial Dr. narrows at Creek Turnpike Thursday night

The right lanes of both north and southbound US-64/Memorial Dr. will be closed under SH-364/Creek Turnpike from 11 p.m. to 3 a.m. Monday for safety device repairs.

 

Ongoing Highway Construction Projects

 

I-44/US-75 interchange improvement continues through summer 2028

A major interchange improvement project continues at the interchange of I-44 and US-75 through summer 2028. Current closures include:

  • The east and westbound I-44 ramps to northbound US-75 are closed. Drivers can detour using eastbound I-244 to northbound US-75.
  • The southbound US-75 ramp to westbound I-44 is closed. Drivers can detour using westbound I-244.
  • The southbound US-75 ramp to eastbound I-44 is closed. Drivers can detour using westbound I-244 to eastbound I-44.
  • The southbound US-75 on-ramp from 41st St. is closed.
  • Skelly Dr. is closed between Union Ave. and Olympia Ave.
  • 51st St. is closed between Jackson Ave. and Olympia Ave.
  • 46th St. is narrowed to one lane at US-75 with temporary traffic signals.

 

I-44, SH-66 interchange improvement continues in Catoosa through 2026

Lane closures continue on east and westbound I-44, SH-66 and the I-44/Will Rogers Turnpike ramp to westbound I-44 in Catoosa for an interchange improvement project. Lanes are also narrowed in width. Two lanes of traffic on I-44 will be maintained in both directions at peak travel times. Current traffic impacts include:

  • The westbound I-44 off-ramp to northbound SH-66 is closed. SH-66 traffic can detour using the 165th E. Ave. exit to rejoin eastbound I-44 and take the northbound SH-66 exit.
  • The southbound SH-66 ramp to westbound I-44 has a limited merge area.
  • The eastbound I-44 exit lane for SH-66 is shifted west of 193rd E. Ave.
  • Eastbound I-44 traffic is shifted at 193rd E. Ave.
  • The eastbound I-44 on-ramp from 193rd E. Ave. has a limited merge area.

 

US-75 narrowed to one lane between 56th St. N. and 66th St. N.

North and southbound US-75 are narrowed to one lane in each direction between 56th St. N. and 66th St. N. through summer 2026 for bridge rehabilitation.

  • The northbound US-75 on-ramp from 56th St. N. is closed.

 

SH-97 pavement rehabilitation continues in Sand Springs through January 2026

Drivers can expect various, intermittent lane closures on SH-97 from S. Main St. to W. 2nd St. in Sand Springs through January 2026 for a pavement reconstruction project.

Last Modified on Dec 04, 2025