Skip to main content

US-77 in Lexington from east end of Canadian River Bridge north 1.0 mile to 0.25 mile south of Moffatt Road Virtual Open House

 

Please click the link below for the virtual open house summary
JP 20997(19) US-77 in Cleveland County

 

Where When
Due to concerns over the spread of COVID-19, this will be a web-based format (no in-person meeting) https://www.odot.org/I35Purcell
(this link is no longer live)

The information will be available beginning November 6, 2020 and comments are requested by November 23, 2020.

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.


Purpose

The purpose of the virtual open house is to present information about the project and obtain input from the public to furhter assist in the identification of critical social, economic and envionmental effects that may result from the project.  

Please click the image below for project location map

Description

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), is proposing reconstruction and widening of US-77 through Lexington in Cleveland County. Existing US-77 is a two-lane roadway with multiple skewed intersections of local roads, business drives, residential drives, alleyways, and a multi-point intersection with SH-39. The existing annual average daily traffic (AADT) volume on US-77 is approximately 12,000 vehicles per day (vpd). By 2045, volumes are expected to increase to approximately 16,680 vpd, resulting in unacceptable levels of congestion and delay. There have been 40 documented collisions within the project area since 2010, approximately half of which involved injury. Over 80% of the collisions occurred at intersections, with the highest number occurring at the US-77/SH-39 intersection. ODOT has recently tasked a Consultant to look at alternatives for improving US-77 through Lexington and the intersection at SH-39, while taking into consideration construction costs, right-of-way costs and environmental constraints. 

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON NOVEMBER 23, 2020

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Aug 19, 2021
Back to Top