Open House

Open House for US-75 Glenpool
Please click the link below for the public meeting summary
JP 35120(08) US-75 in Glenpool
Where When

Glenpool Conference Center

12205 S. Yukon Ave

Glenpool, Oklahoma 74033

Tuesday, November 28, 2023

5:30 PM - 7:00 PM

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.

Purpose

The Oklahoma Department of Transportation (ODOT) will host an in-person Open House to inform the public of the proposed improvements to the intersection of US-75 at 141st Street in the City of Glenpool and to provide an opportunity for the public to submit comments. It will be a come-and-go format with no formal presentation.

Description

The intersection of US-75 and 141st Street is showing an increase in traffic congestion and a need for safety improvements. This existing portion of US-75 consists of four, twelve-foot driving lanes with four-foot paved inside shoulders, ten-foot paved outside shoulders and divided open median. The corridor provides access to residential, commercial, and industrial developments. The Current configuration of the roadway is partially access controlled with points of ingress and egress throughout the roadway, some of which are the only points of access. Project goals include improving safety and increase capacity/efficiency of the roadway, obtain access control of the facility, and improve traffic flow along the corridor on the existing alignment. ODOT is proposing to improve the interchange by converting the existing at-grade intersection at US-75 and 141st Street in Glenpool, to a grade separated interchange with US-75 over 141st Street. Entrance and exit ramps will be constructed along US-75, providing access to and from 141st Street. Furthermore, protected turnarounds will be constructed from the US-75 northbound exit ramp to the US-75 southbound entrance and from the US-75 southbound exit ramp to the US-75 northbound entrance ramp. The purpose and need of the project are to improve the operation and capacity of the intersection to accommodate existing and future traffic volumes, improve safety, and enhance local and regional connectivity. Access to all existing private and commercial properties will be maintained during and after construction. ODOT completed an Environmental Assessment in 2002 and is now in the process of performing a re-evaluation of the environmental document.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON DECEMBER 12, 2023

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Feb 19, 2025
Back to Top