Watch the FMA Webinar (FY 2026)
Watch Video
Transcript
So y'all can't see because I'm using their computers. But we are joined today by Chadwick England Glasgow, our Resilience Program Specialist, and our brand new Resilience Program Specialist, Roslyn Richards. And then of course, most of y'all know me, but if you don't, I'm Chylar Gibson I'm the State Hazard Mitigation Officer here at OEM. Unable to join us today, but important that y'all know his name.
JJ Little is also our Resilience Division Director. So whenever your email, the H.M. email, these are the four of us that you will be able to be contacting through that email. We really encourage you all to use that email and not a specific person.
That way we guarantee that everyone can see it and anyone can answer in case somebody is out. So I hope everyone can see my screen. Now we've got the Flood Mitigation Assistance Fiscal Year 2026 NOFO Subapplicant Briefing. We're just going to go over this informational briefing.
Go over. The Flood Mitigation Assistance, or FMA program, specifically for the fiscal year 2026 NOFO. It's a little bit different than the 2024 NOFO. So please keep that in mind as we go through some things today.
Please feel free to add any questions you may have into the chat, and we'll get to them as quickly as possible, The session is really just designed to help all of our communities understand what FMA funds are, who's eligible to apply, what FEMA and OEM will look for in a competitive subapplication and what you should be doing now to start preparing, if you're considering for the FMA project frequent and costly hazards for communities, and FMA is one of the key federal programs focused on reducing repetitive flood damage to structures insured through the National Flood Insurance Program or NFIP. The goal today is to make sure the program requirements are practical and actionable, so you can decide whether FMA is the right program for you. Thanks for being here today. Let's get started.
Kind of an agenda for today we will, really start with the program overview so that everyone has the same basic understanding of what FMA is, how it's funded and how it fits within FEMA, broader hazard mitigation assistance programs. From there, we'll talk through eligible activities to cost share. Those topics usually drive the first major decision point for a potential applicant, whether the project fits the program and what local match may be required. Then we'll walk through the timeline and how to apply through OEM followed by, FEMA's evaluation criteria and the documentation that needs to be included in a competitive sub application.
After that, we'll cover the benefit cost analysis, which is a required eligibility component for project applications. And then later we'll spend time on management costs, procurement and conflicts of interest rules. Those topics may feel administrative, but they can determine whether costs or reimbursable after award. So they're really important to understand on.
We'll close with best practices common pitfalls and then open it up to questions. To begin, we're going to set the foundation for the FMA program what it is, how it's funded and who it's intended to serve. This is this section is really important because FMA is more targeted than some other FEMA mitigation programs. It is not a general resilience grant and it is not a broad infrastructure program.
It is purpose is specifically tied to reducing flood risk and reducing future NFIP claims. So FEMA has several major hazard mitigation funding programs. So it's kind of helpful to understand where FMA fits into that landscape. So on the predisaster side, we have the Flood Mitigation Assistance or FMA, BRIC, which is Building Resilient Infrastructure and Communities, and the Safeguarding Tomorrow Revolving Loan Fund Program or Storm.
These programs are intended to reduce future risk before the next disaster occurs, but they each have a different focus. They are all also nationally competitive. On the post-disaster side, FEMA has the Hazard Mitigation Grant program, or HMGP, which many of you are probably the most familiar with. HMGP becomes available after a major disaster declaration and is designed to reduce future loss of life and property following that event.
It is not nationally competitive and is based on funding allocations to the state. FMA is the most targeted of these programs. It is specifically focused on reducing repetitive flood damage to structures insured under the National Flood Insurance Program, or NFIP. BRIC is broader and can support mitigation for many hazards before a disaster.
And STORM is structured differently as a state revolving loan program for mitigation and resilience investments. Understanding the differences between these grant programs is really important when thinking through where your priority projects are. the Flood Mitigation Assistance Program for the current fiscal year 2026 NOFO. There is $400 million available through a national competition.
That funding is divided into three categories of eligible activities capability and capacity building, or C and CB, localized flood risk reduction projects and individual flood mitigation projects. For Oklahoma communities, an important process point is that the applicants must apply through OEM. FMA is a cost reimbursement program, meaning costs are generally incurred and then reimbursed after approval rather than paid up front, and all projects must be cost effective using an approved FEMA benefit cost analysis methodology, and both phased projects and planning activities are allowed. Important program priorities.
FMA is very focused on reducing flood risk and federal flood insurance claims. In order to be eligible to apply. Applicants must be NFIP participating community. Participating communities are local jurisdictions that have adopted and enforce FEMA compliant floodplain management regulations, which allow residents and property owners to purchase flood, federal flood insurance through the NFIP program.
For FMA, the subapplicants must be located within an NFIP participating community that is in good standing or otherwise that project is not eligible for funding. One of the most important things to understand about FMA is how FEMA prioritizes repetitive loss structures. A repetitive loss, or RL property, is an NFIP insured structure that has experienced flood related damage on two separate occasions, where the cost of repair equaled or exceeded 25% of the market value of the structure at the time of each flood event, a severe repetitive loss or SRL property has an even more significant claims history. As shown here this can include properties with four or more separate claims payments greater than $5,000 each, including building and contents payments or properties with two or more separate building claim payments where the total payments exceed the current value of the property.
Projects that benefit RL and SRL properties are generally more competitive. Are generally more competitive because they align directly with FEMA's goal of reducing repeat NFIP losses. As you evaluate potential projects, please start by asking do we know which properties are NFIP insured? Do we know whether any are RL or SRL.?
And can we document the project's benefits to those structures? Those questions will come up throughout the application process. For eligible activities and cost share it's important to note, It's important to note that FMA can support several types of activities, but each category has different funding levels, documentation that's required, and evaluation criteria. Additionally, understanding cost share structures...
the cost share structure early can make a major difference in project planning and community outreach. So before getting into activity types, let's start with the basic eligibility requirements. Eligible subapplicants include cities, counties, special districts, utilities, and similar eligible public entities. Individual residents cannot apply directly to FEMA for FMA.
If a homeowner is interested in an elevation, acquisition, reconstruction, or other individual mitigation activity, they must be supported by an eligible subapplicant, such as their city or county. There are also several prerequisites to apply the must participate in the NFIP. The community must have a FEMA approved Hazard Mitigation Plan, and the properties or beneficiaries included in the project must have flood insurance through the National Flood Insurance Program. These are threshold requirements if a community is not in good standing with the NFIP, participation does not have an approved mitigation plan, or cannot document NFIP insurance for the benefiting structures the project may not be eligible for FMA funding is organized into three major categories, and each category has its own purpose and funding allocation.
The first category is capability and capacity building activities, with approximately $20 million available. This category includes activities such as hazard mitigation plans, project scoping partnerships, severe repetitive loss and repetitive loss strategy development, and floodplain management program enhancements. These activities can be used to build a pipeline of strong future mitigation projects which FMA likes to see. It is also important to note here that HMP updates can still be funded through FMA, though planning is no longer allowed under the BRIC program, so this can be a good funding avenue for communities that have expired or are expiring HMPs.
The second category is localized flood risk reduction projects, which with approximately $260 million available. This is the largest flooding funding category and includes infrastructure type projects such as stormwater system upgrades, retention and detention basins, small flood walls and pump stations, and stream restoration. The key is that these projects must reduce flood risk for NFIP insured structures. The third category is individual flood mitigation projects with approximately $120 million available.
These are property level projects such as acquisitions and demolition or relocation, structure elevations mitigation, reconstruction and dry flood proofing of historic or nonresidential structures. The program is broad in the types of activities it can support, but it is narrow in its purpose. Every activity must tie back to reducing flood damage and NFIP insurance claims. Cost Share is one of the most important planning considerations for FMA, as it is not standard across all projects.
For most FMA projects, the standard cost share is 75% federal and 25% Nonfederal. This means that communities or other eligible nonfederal source must cover the remaining 25%, unless a higher federal share applies. Individual flood mitigation projects can have a different cost share structure depending on the property type, so repetitive loss properties may be eligible for up to 90% federal share, and severe repetitive loss properties may be eligible for up to 100% federal share. NFIP insured properties that do not meet RL or SRL thresholds generally remain at that standard.
75% cost share. Local match can be covered by the community or passed on to homeowners, depending on how the local program is structured. For example, if a repetitive loss home is elevated and qualifies for a 90% federal share, the remaining 10% could be the homeowners responsibility if that is how the community sets up the program. That is why early property identification matters.
Knowing whether properties are in NFIP insured repetitive loss or severe repetitive loss helps the community understand both competitiveness and affordability. Next, we'll discuss some key changes that are worth noting since the 2024 NOFO for that was released. There are two important implications for applicants. The first, reduced funding across the program will likely mean greater national competition for the available funds.
Overall funding decreased from $600 million to $400 million, including substantial reductions for C and CB and localized flood risk reduction projects. Second, the localized flood risk reduction projects must now benefit an area with at least 35 actively NFIP insured homes. Applicants should confirm the number and location of active policy early in project development. Smaller project areas may need to be expanded or combined with other areas, while still forming a logical and defensible project.
Please note that this new threshold does not apply to individual flood flood mitigation projects. For timeline and how to apply thro through 372 OEM so please note that even as you read the NOFO that deadlines will be different based off of, internal deadlines that we need to meet as well. Because subapplicants move through the state, coordination with OEM from the beginning is really essential. So this slide really lays out the major steps in the application process.
The first step is to confirm that the activity that the community participates in the NFIP and that the hazard mitigation plan is approved. Those are eligibility prerequisites. So they must be confirmed before a community invests significant time in application development. Next, community should contact OEM and submit a notice of intent through EM grants.
This gives OEM visibility into potential projects and allows us to help identify whether the project appears to be a good fit for FMA. After that, the community develops the core application materials, including draft scopes of work, cost estimates, schedules, and the benefit cost analysis documentation. These pieces should align with one another. The scope should describe exactly what will be done.
The budget should support that scope, and the schedule should show how the work can be completed within the period of performance. The most important takeaway is to start early. If you wait until late December to start assembling the scope in BCA in the cost estimate and all of your property documentation, it'll be very difficult to complete and submit a competitive package. Now we'll turn from eligibility and process to how applications are evaluated and what documentation FEMA expects to see.
A strong FMA application is not just a good project idea. It is a complete, well documented package that clearly explains the problem. The proposed solution, the benefits to NFIP insured structures, the cost, the schedule, and the community's ability to implement the work. FEMA evaluates applications differently depending on whether the activity is capability and capacity building, localized flood risk reduction, or individual mitigation.
Flood mitigation. And in the next several sides, we'll walk through the common application components first and then the category specific evaluation criteria. For all project applications, there are several core components that need to be included. First is a detailed scope of work.
The scope should be specific enough that reviewers understand exactly what the project will accomplish, where it will occur, what structures or areas benefit, and how the proposed activities reduce flood risk. Second is a cost estimate that aligns with the scope of work. If the scope describes engineering, construction, acquisition, elevation, or environmental work, the budget should clearly show these cost elements and include a budget narrative who are needed. Third is a project schedule with milestones.
So for FMA, community should plan around a 36 month period of performance. So that schedule should be realistic for design, permitting, procurement, environmental review, construction, closeout and any homeowner coordination. Fourth is a benefit cost analysis, or BCA, showing that the project is cost effective for project subapplications. The benefit cost ratio must be at least 1.0 unless a FEMA approved streamlined methodology applies.
Applications also need environmental and historic preservation documentation as well as documentation of NFIP benefits, including policyholder information and flood insurance claims were available. FEMA's open FEMA data sets can be helpful as a starting point, and community should also coordinate with OEM and state NFIP contracts. Contacts. As a excuse me For individual flood mitigation projects, additional property level documentation is required, including a list of participating properties, voluntary participation forms, property appraiser data to document ownership, and the NFIP Flood Insurance Policy declaration pages.
As mentioned earlier, there are different funding caps and scoring criteria for each funding category. As a reminder for the capability and capacity building category, these activities are intended to strengthen a community's ability to identify, develop and implement flood mitigation projects that reduce NFIP losses over time. Funding caps apply at both the applicant and subapplicant levels, so, for example, hazard mitigation planning activities have specific caps. Project scoping can be up to $900,000 per subapplication, and additional capability and capacity building activities can be up to 300 000 per subapplication.
FEMA will review these applications and prioritize them in the specific order listed here. Hazard mitigation plans are listed first, followed by project scoping and then additional activities such as partnerships, enhancing floodplain management programs, repetitive loss and severe repetitive loss strategy development and subapplication damage procedures. pardon me, substantial damage procedures. That makes more sense.
The evaluation criteria on the right, on the right show award points. So a competitive a complete repetitive loss strategy that includes substantial damage procedures is worth five points. Participation in the community rating system is worth three points. And participation as a cooperating technical partner is worth three points.
The practical takeaway is that these applications should not read like general planning requests. They should explain how the activity will improve floodplain management, support NFIP compliance, identify and advance future mitigation projects, and ultimately reduce the future flood Localized flood risk reduction projects are the largest funding category in this FMA cycle, and they are where many community scale infrastructure projects will fit. There is a $50 million federal cost share cap for these projects. And phase projects are allowed.
That is important because the community does not necessarily need to have every design and construction detail finalized before submitting. A phase approach can be appropriate when additional design, analysis, or permitting is needed before full implementation. All applications must document the proposed benefit project benefits for NFIP insured properties. They should also include maps and geospatial files showing the project location, the area where flood risk will be reduced, and active NFIP policies if that information is available when hydraulic and excuse me when hydraulic and hydrologic models are available.
The reduced risk area should align with these models. FEMA's project evaluation criteria are heavily driven by NFIP data and claims history. Points are awarded for active NFIP policies in the benefit area for repetitive loss and severe repetitive loss properties for significant recent NFIP flood insurance claims for projects generated from a previous FMA award, and for communities that participate in CRS or CTP. However, now is prioritizing projects with a 4 to 1 BCR and retains discretion to select projects outside of ranked order.
A five year history of NFIP claims payments will also be used as a tiebreaker. In other words, documentation and data matter. The stronger community can show who benefits and how the project reduces flood risk. The stronger the application will be.
Now let's talk about individual flood risk reduction projects. This is the category most people associate most closely with FMA. Since projects include residential elevations, acquisitions, and similar property level mitigation projects. There is at least $120 million available nationwide in this funding category, and properties must be identified in the subapplication and documentation of homeowner voluntary interest must be submitted.
FEMA is not looking for vague concepts or future property lists. The application needs to identify the actual participating FEMA encourages communities to submit packages of residential mitigation projects rather than one off individual properties. Priority is given first to packages where at least 75% of the structures are severe repetitive loss or repetitive loss properties. FEMA also prioritizes packages with the highest counts of SRL and RL properties, and the highest NFIP claims history for benefit of fitting properties.
If funds remain available, FEMA then applies additional evaluation criteria, including points for substantially damaged structures. Points for FEMA and NFIP did not defined RL and SRL properties in the benefiting area and points if the project was generated from a previous FMA award. The strategy here is to identify and package the strongest properties. Early community should focus outreach on NFIP insured properties with repetitive loss histories, and build a package that is both competitive and administratively ready.
This slide highlights several common individual project types and the requirements that come with. For acquisition and demolition projects, properties must be maintained as open space and perpetuity and restricted from future development. This means the community must be prepared for the long term responsibility of maintaining the property, in accordance with FEMA's open space requirements. For elevation projects, structures must be elevated to at least the base flood elevation or BFE or higher if required by local ordinance.
Community should confirm local floodplain management standards early, so the scope of work reflects the correct elevation requirement. And for mitigation reconstruction, the new construction cannot exceed 10% of the original square footage. The property must meet current building codes and floodplain management standards. The slide also notes a $220,000 federal cap for construction costs.
Each project type has a different documentation, homeowner coordination, design, permitting, and long term compliance considerations. Before selecting a project type, community should think not only about eligibility, but also about what they can realistically implement and manage after an award. Individual project cost share can become more complicated when different property types are combined into one sub application. FMA allows properties with different federal cost share requirements to be submitted together in a single project subapplication.
For example, one property may qualify for a 100% federal cost share because it is a severe repetitive loss. Well, another may qualify for a 90% federal cost share because it is a repetitive loss when properties are packaged together. The overall federal share should reflect the average federal cost share of the structures included in the package. The example on this slide shows how different property level cost shares can be combined into an overall project percentage.
However, it is still a subrecipient and recipients responsibility to ensure that the correct federal cost share is applied to each individual property. Community should track this carefully during application development and implementation so that homeowners, local match sources, and reimbursement requests are all aligned. This is another reason why early property data collection is critical. The more accurately you understand each properties, NFIP status, RL or SRL status, and estimated project costs, the better you can plan the match and avoid surprises later Next, we'll focus on the benefit cost analysis or the BCA for FEMA hazard mitigation programs.
The BCA is the tool used to show that a projects expected benefits are equal to or greater than its cost, and general, a project must have a cost ratio of at least 1.0 to be considered cost effective. FMA includes several BCA approaches and streamlined methods, especially for smaller projects and certain individual mitigation activities. The key is to choose the method that is appropriate for the project, and to provide enough documentation for FEMA to understand the risk, the benefits, and the cost assumptions. The basic formula for benefit cost analysis is shown at the top.
Total benefits divided by total cost equals the benefit cost ratio, or BCR. For FEMA purposes, the BCR must be at least 1.0 for the project to be considered cost effective. There are three approaches highlighted here. At the first is a narrative for projects under $1 million, has released application support material for these narratives, and at a minimum, they need to address historical or expected hazard risk, benefit locations and the benefiting population and annual maintenance costs.
The second approach is a precalculated benefits for certain elevation and acquisition projects in the Special Flood Hazard area. FEMA provides benefit values that can be streamlined that can streamline the cost effectiveness determination. The values shown here include $231,640 for elevations in the SFHA $365,747 for acquisitions in the SFHA, and $365,747 for acquisitions of RL and SRL properties. The third approach is modeled damages.
This method uses property details and data from the Flood Insurance Rate study to estimate project benefits. It can be more data intensive, but it may be appropriate where precalculated benefits do not fully capture the value of the project. A common misconception is that the precalculated benefit values are funding caps. They are not.
They are one way to demonstrate cost effectiveness. If a project cost exceeds those values, the applicants may still be able to use another FEMA approved PCA method if the data supports it. We're now going to shift into several compliance topics that are sometimes overlooked during application development, but become very important after award. This includes management costs, procurement, and conflicts of interest rules whether affecting whether costs are eligible and reimbursable.
A project may technically be strong and selected for funding, but if the procurement was not done correctly or a conflict of interest exists, the community can face delayed reimbursements, disallowed cost or repayment obligations. The best time to think about these requirements is before you hire consultants, issue solicitations or incur costs. These rules should shape your application development strategy and your implementation plan from the start. This slide summarizes management costs in the period of performance and pre award costs for sub recipients.
Management costs maybe up to 5% of the total sub application budget, including both federal and Nonfederal shares. Management costs must be included as a separate line item in the scope of work and cost estimate, and should have their own budget narrative. They are not something to add informally after the fact. The period of performance for FMA is 36 months from the date of award.
Extensions may be allowed, but they are not automatic. Extension requests must be submitted 90 days before the period of performance expires, and additional federal funds are not awarded simply because a project receives an extension. Pre-award costs may be eligible, with FEMA approved with FEMA approval when they are tied to developing the application, such as the benefit cost analysis, environmental data, or design specifications. These costs must be identified as a line item in the cost estimate, and may count toward the nonfederal share Implementation costs incurred before award are not allowed, so community should be careful not to begin construction or other implementation activities before they have the appropriate approvals.
Procurement compliance is one of the most important areas for communities to plan around early. All purchases under an FMA award must comply with the two CFR 200 317 through 327 rules. Local governments and nonprofits must use their own documented procurement procedures. But also.
But those procedures must conform to federal standards. States and tribes follow their own procurement policies while also complying with applicable federal requirements, such as domestic preference and required contract provisions. O&M expects full and open competition with documented rationale for the procurement method, contract type, contractor selection, and price basis. Communities should have a written procurement policy on file before issuing a solicitation.
Contracts also need to include the required federal clauses from appendix 2 to 2. CFR part 200, and infrastructure projects must address the build a Build America by America Act requirements where applicable. This slide also lists restrictive practices to avoid. These include noncompetitive contracts to consultants on retainer.
Specifying a brand name without allowing equals unnecessary experience requirements, excessive bonding cost plus percentage of cost contracts, and splitting purchases to avoid competition thresholds. OEM will not process reimbursement until procurement documentation is submitted, including the procurement policy documentation, documented process selection rationale, and executed contract required documents. The message is simple plan for procurement compliance now, not after the work is Conflict of interest rules are closely related to procurement and should be considered before a community engages, consultants or contractors. The NOFO states that a contractor that helps develop the grant application, project plans or budget cannot then compete for the contract to implement or construct the project.
This includes pre award services such as grant writing and post award services such as grant management. If those services create an unfair competitive advantage under organizational conflict of interest rules, your application consultant generally cannot bid on the construction contract. Former employees who worked on the application may also be barred, depending on the circumstances. One exception noted here is a competitively procured contract that covers both the application development and the execution from the beginning.
Personal conflicts of interest rules also apply. Communities need written conflict of interest standards before awarding any contract. No one with a real or apparent conflict may participate in contractor in contractor selection, award, or administration that includes financial interests held by the individual, immediate family partners or employing organizations. The standards must also include disciplinary actions.
The key takeaway is to decide your procurement strategy before you engage a consultant. If a conflict of interest is found later, costs may be disallowed and the community may have to repay the federal Now that we've covered eligibility activities, evaluation criteria, BCA and compliance, let's bring the discussion together with best practices for developing competitive FMA applications. The most successful applications do three things very well. The first is they clearly connect the project to reduced flood risk for NFIP insured structures.
Second, they provide strong data and documentation to support that benefit. And third, they demonstrate that the applicant understands the schedule, cost, procurement and implementation requirements. The next few slides translate those ideas into practical tips for the three FMA funding categories. For capability and capacity building activities.
The most important differentiator is a clear explanation of how the activity will provide benefits to the NFIP. Planning, scoping and program enhancement activities should not be presented as general studies. They should be tied to future flood mitigation outcomes, reduced claims, and stronger NFIP compliance. Mapping and geospatial documentation are also important.
Community should submit maps and geospatial files showing benefiting areas and should use available data such as census tracts, zip codes, policy information or other relevant data sets to quantify who and what will benefit. Project scoping can be especially valuable when used to build a pipeline of future mitigation applications. A strong scoping application should explain how the work will move a project from concept toward a future implementation ready application, and for localized flood risk reduction projects the strongest applications usually benefit a high number of NFIP insured RL and SRL properties. Community should gather NFIP policy data if they can document claims history were available and show the reduced risk area.
Communities with recent flood claims may be prioritized and phase infrastructure projects can be a good option when more design work is needed before construction. In both categories, the theme is the same document the benefit connected to the NFIP outcomes and make the path to implementation clear. For individual flood mitigation projects. Early outreach is essential.
Community should prioritize outreach to severe, repetitive loss and repetitive loss properties because those properties provide both a cost share advantage and a competitiveness advantage and packaging matters. FEMA encourages packages of properties and those properties should be designed strategically, including SRL and RL properties could strengthen the application and may also help balance benefit cost analysis results across the package. Community should also watch average cost shares and project costs. Very high cost elevations and acquisitions may not be prioritized, so applications so applicants should evaluate whether the package is competitive from both a cost and benefit perspective.
Community communication with homeowners is critical. Participation is voluntary and award timelines can be really long. Homeowners need to understand the process, the potential match requirement, the expected timeline, and what documentation they will need to provide. Community should identify both priority and alternate properties.
You cannot add properties after FEMA's review process. So if a homeowner drops out, having alternates identified early can help avoid gaps and finally use alternate BCA methodologies when needed. FEMA's precalculated benefits are not funding caps, and if a project exceeds those values, another FEMA approved methodology may still demonstrate cost effectiveness. If the data supports and we've made it to the end.
If your community is considering an FMA application, please reach out early. OEM can help you understand program fit, timing, require documentation and next You can submit questions in the chat today, or you can also contact OEM after the briefing by email at HM@oem.ok.gov or through the OEM website. So I will stop sharing my screen so that I can see the chat for any questions you may Yes, we will share both the slides and a recording of this webinar on our website. It should be available within the next week.
All right. I see a question from Kate Burnham. Can you provide some additional information regarding the new requirement that 35 properties have to be included in the project benefit area? Does the project have to have a direct impact on all 35 properties or just in the This is.
True. It does have to have a direct impact, in terms of reducing the flood risk for all 35 properties, it has to be a minimum of 35 properties. And it does not just have to be homes, it can be other properties. That are covered under the NFIP.
So the community, applying has to be a member, an active member of the NFIB, and each of the properties benefiting have to be NFIP That's a good question. Aaron. If you're on, do you think you could provide some more detail on Hey, Chylar. I think so.
Stormwater master plan certainly sounds like it could be. So, yeah, I think maybe if we just had a little more, details, we could look into that as a potential project. I think if you're interested in that project, go ahead and submit a NOI in EM grants and provide us with a little more detail about, what you expect to include in that master plan. And then we'll be able to more accurately address what type of project type Give it a few more minutes for questions, but after that, if y'all have any other questions, please feel free to email us or find us.
Or just go ahead and submit an NOI in EM grants. We approve them on a rolling basis, so you should know within about a week if we'll reach out and let you know if we think it's a good project type, what type we think you should fit under and, offer any type of technical assistance you may need as well. Awesome. Well, thank you again all for joining today and we look forward to seeing you via an NOI or email if you have any questions.
Thanks y'all.